Client: Central Bank of India. Site Area: 4.5 Acres Location: Koti, Hyderabad Total Built up Area: 75,000 Sft. Estimated Cost of Construction: Rs.20 Crores The Training College project was awarded after a design competition held by the Central Bank of India.
Client: AP Rajiv Swagruha Corporation Ltd. Site Area: 131.3 Acres Location: Nellore Total Built up Area: 11,09,974 Sft, spread over 1288 Bungalows Cost of Construction: Rs.120.4 Crores This is a residential township with independent bungalows to suit all the categories of Income groups.
Client: AP Rajiv Swagruha Corporation Ltd. Site Area: 56.25 Acres Location: Yendada, Visakhapatnam. Total Built up Area: About 39,75,000 Sft with 3588 flats spread over 23 blocks. Estimated Cost of the Project: Rs.478.56 Crores The project is located adjacent to the Visakhapatnam – Bheemili Beach Road and opposite to the Rushikonda Beach. This [...]
Client: AP Rajiv Swagruha Corporation Ltd. Site Area: 28.74 Acres Location: Pocharam, Hyderabad Total Built up Area: 24,88,364 Sft with 2604 flats spread over 27 blocks. Cost of Construction: Rs.267.45 Crores The project commenced in the month of October’ 2007, and is nearing completion. This was the first project to have grounded under this [...]
Client: Satyam Computer Services Ltd. Site Area: 6.54 Acres Location: Visakhapatnam, Andhra Pradesh. Total Built up Area: 3,30,000 Sft (Phase-I is 1,71,000 Sft) Prasad Associates were the Architectural, Engineering and Interior Design Consultants for the first IT campus in the city of Visakhapatnam. The construction of the campus has started in the year [...]
Client: Dhatri Constructions Site Area: 16 Acres Location: Bandlaguda, Hyderabad Total Built up Area: 23,00,000 Sft spread over 1671 Flats Estimated Cost of Construction: Rs.350 Crores